| |
|
Description |
Part number |
Availability |
Qty |
PU (excl VAT) |
Discount %(excl VAT) |
Total (excl VAT) |
|
|  | G2-59 Steel spur gear Steel 20NCD2 | Lead time: 08 weeks | | 170,32 € | 0 % | 170,32 € | PU (escl VAT) : 170,32 € Remise : 0 % Total (excl VAT): 170,32 € |
|  | VMS10-25 Stainless steel knurled thumb screw Knurled | In stock | | 28,51 € | 0 % | 28,51 € | PU (escl VAT) : 28,51 € Remise : 0 % Total (excl VAT): 28,51 € |
|  | ZG1-9 Plastic spur gear Machined plastic (delrin) | In stock | | 13,16 € | 0 % | 13,16 € | PU (escl VAT) : 13,16 € Remise : 0 % Total (excl VAT): 13,16 € |
|  | ASM0509-05 Cylindrical polymer bush Food grade polymer | Lead time: 03 weeks | | 5,96 € | 0 % | 11,92 € | PU (escl VAT) : 11,92 € Remise : 0 % Total (excl VAT): 11,92 € |
| ASM0509-05 the quantity has to be a multiple of 2. |
|  | T2.5/265/6 T type timing belt T2.5 Steel cored polyurethane | In stock | | 16,59 € | 0 % | 16,59 € | PU (escl VAT) : 16,59 € Remise : 0 % Total (excl VAT): 16,59 € |
|  | PW2.0-4S Worm - precision range Stainless steel | Lead time: 09 weeks | | 209,25 € | 0 % | 209,25 € | PU (escl VAT) : 209,25 € Remise : 0 % Total (excl VAT): 209,25 € |
|  | ASM2228-20 Cylindrical polymer bush Food grade polymer | Lead time: 03 weeks | | 6,71 € | 0 % | 13,42 € | PU (escl VAT) : 13,42 € Remise : 0 % Total (excl VAT): 13,42 € |
| ASM2228-20 the quantity has to be a multiple of 2. |
|  | AT5/525/25 AT type timing belt AT5 Steel cored polyurethane | Lead time: 04 weeks | | 65,38 € | 0 % | 65,38 € | PU (escl VAT) : 65,38 € Remise : 0 % Total (excl VAT): 65,38 € |
|  | T5/525/6 T type timing belt T5 Steel cored polyurethane | Lead time: 04 weeks | | 18,89 € | 0 % | 18,89 € | PU (escl VAT) : 18,89 € Remise : 0 % Total (excl VAT): 18,89 € |
|  | ZM2-20/2 Wormwheel Machined plastic (delrin) | Lead time: 10 weeks | | 109,71 € | 0 % | 219,42 € | PU (escl VAT) : 219,42 € Remise : 0 % Total (excl VAT): 219,42 € |
| ZM2-20/2 the quantity has to be a multiple of 2. |
|  | 29HTD14M-55F HTD Heavy duty timing pulley HTD14 Cast iron or Steel | Lead time: 03 weeks | | 99,50 € | 0 % | 99,50 € | PU (escl VAT) : 99,50 € Remise : 0 % Total (excl VAT): 99,50 € |
|
Total excluding delivery
|
866,36 €
|
| Estimated shipping costs** |
0,00 € |