| |
|
Description |
Part number |
Availability |
Qty |
PU (excl VAT) |
Discount %(excl VAT) |
Total (excl VAT) |
|
|  | PCS62-23H-38K Chain sprocket with hardened teeth 15.875mm (DIN10B-1) | Lead time: 03 weeks | | 27,04 € | 0 % | 27,04 € | PU (escl VAT) : 27,04 € Remise : 0 % Total (excl VAT): 27,04 € |
|  | Z-12-1000A Shaft for linear guides Hardened ground steel | In stock | | 22,33 € | 0 % | 22,33 € | PU (escl VAT) : 22,33 € Remise : 0 % Total (excl VAT): 22,33 € |
|  | NT122-10 Spur gear coaxial gearbox from 32 to 85 Nm - Inline | Lead time: 12 weeks | | 1 947,61 € | 0 % | 1 947,61 € | PU (escl VAT) : 1 947,61 € Remise : 0 % Total (excl VAT): 1 947,61 € |
|  | VTSM6-10/HDSS Ball head screws Hygienic Design® Stainless steel | Lead time: 02 weeks | | 8,68 € | 0 % | 8,68 € | PU (escl VAT) : 8,68 € Remise : 0 % Total (excl VAT): 8,68 € |
|  | BMF15-M4 Knurled knob - female Knurled - blind | In stock | | 1,52 € | 0 % | 6,08 € | PU (escl VAT) : 6,08 € Remise : 0 % Total (excl VAT): 6,08 € |
| BMF15-M4 the quantity has to be a multiple of 4. |
|  | PWG0.5-50-4 Wheel - precision range Bronze | Lead time: 09 weeks | | 96,52 € | 0 % | 289,56 € | PU (escl VAT) : 289,56 € Remise : 0 % Total (excl VAT): 289,56 € |
| PWG0.5-50-4 the quantity has to be a multiple of 3. |
|  | SH0.4-25/LH Parallel axis helical gear Steel 20NCD2 | Lead time: 08 weeks | | 26,87 € | 0 % | 134,35 € | PU (escl VAT) : 134,35 € Remise : 0 % Total (excl VAT): 134,35 € |
| SH0.4-25/LH the quantity has to be a multiple of 5. |
|  | HD6-A-30/30 Double needle roller universal joint Heavy duty | In stock | | 220,09 € | 0 % | 220,09 € | PU (escl VAT) : 220,09 € Remise : 0 % Total (excl VAT): 220,09 € |
|  | NTM10-42/DL Set screw delrin tip Delrin-point | Lead time: 02 weeks | | 6,61 € | 0 % | 6,61 € | PU (escl VAT) : 6,61 € Remise : 0 % Total (excl VAT): 6,61 € |
|  | CHA1056-U16 Screwed hinge 180° | In stock | | 33,03 € | 0 % | 33,03 € | PU (escl VAT) : 33,03 € Remise : 0 % Total (excl VAT): 33,03 € |
|  | HFL0822KF One way needle bearing Needle bearing | Lead time: 02 weeks | | 14,91 € | 0 % | 14,91 € | PU (escl VAT) : 14,91 € Remise : 0 % Total (excl VAT): 14,91 € |
|  | MEF80-100-120 Cylindrical sintered ferrous bush Self-lubricating FP20 ferrous alloy METAFRAM | Lead time: 02 weeks | | 168,81 € | 0 % | 168,81 € | PU (escl VAT) : 168,81 € Remise : 0 % Total (excl VAT): 168,81 € |
|  | HD5-A-25/25 Double needle roller universal joint Heavy duty | Lead time: 06 weeks | | 194,84 € | 0 % | 194,84 € | PU (escl VAT) : 194,84 € Remise : 0 % Total (excl VAT): 194,84 € |
|  | METC14-18-18 Flanged sintered bronze bush Self-lubricating sintered bronze | In stock | | 2,88 € | 0 % | 2,88 € | PU (escl VAT) : 2,88 € Remise : 0 % Total (excl VAT): 2,88 € |
|  | CHAR6755-L-AG Spring hinge screwed | In stock | | 30,21 € | 0 % | 30,21 € | PU (escl VAT) : 30,21 € Remise : 0 % Total (excl VAT): 30,21 € |
|  | PWG1.0-19-4 Wheel - precision range Bronze | Lead time: 09 weeks | | 102,61 € | 0 % | 205,22 € | PU (escl VAT) : 205,22 € Remise : 0 % Total (excl VAT): 205,22 € |
| PWG1.0-19-4 the quantity has to be a multiple of 2. |
|  | PWG0.5-35-1 Wheel - precision range Bronze | Lead time: 09 weeks | | 79,63 € | 0 % | 238,89 € | PU (escl VAT) : 238,89 € Remise : 0 % Total (excl VAT): 238,89 € |
| PWG0.5-35-1 the quantity has to be a multiple of 3. |
|  | RPP14/1890/55 RPP heavy duty timing belt RPP14 | Lead time: 04 weeks | | 351,28 € | 0 % | 351,28 € | PU (escl VAT) : 351,28 € Remise : 0 % Total (excl VAT): 351,28 € |
|  | PTA100-16-100 Articulated levelling foot, pressed base Ø100 15000N | In stock | | 31,70 € | 0 % | 31,70 € | PU (escl VAT) : 31,70 € Remise : 0 % Total (excl VAT): 31,70 € |
|  | HK2501A Manual locking clamp Manual locking clamp LWH | Lead time: 04 weeks | | 208,68 € | 0 % | 208,68 € | PU (escl VAT) : 208,68 € Remise : 0 % Total (excl VAT): 208,68 € |
|  | MAX26-24-200 Motor-gearbox 12V and 24V DC from 0,075 to 0,6Nm | Lead time: 01 weeks | | 380,58 € | 0 % | 380,58 € | PU (escl VAT) : 380,58 € Remise : 0 % Total (excl VAT): 380,58 € |
|  | RPP5/1270/15 RPP heavy duty timing belt RPP5 | Lead time: 04 weeks | | 36,25 € | 0 % | 36,25 € | PU (escl VAT) : 36,25 € Remise : 0 % Total (excl VAT): 36,25 € |
|  | PWG1.5-21-4 Wheel - precision range Bronze | Lead time: 09 weeks | | 155,77 € | 0 % | 311,54 € | PU (escl VAT) : 311,54 € Remise : 0 % Total (excl VAT): 311,54 € |
| PWG1.5-21-4 the quantity has to be a multiple of 2. |
|
Total excluding delivery
|
4 871,17 €
|
| Estimated shipping costs** |
0,00 € |