| |
|
Description |
Part number |
Availability |
Qty |
PU (excl VAT) |
Discount %(excl VAT) |
Total (excl VAT) |
|
|  | ZM0.4-100/2 Worm and wheel set Machined plastic (delrin) | Lead time: 10 weeks | | 30,28 € | 0 % | 151,40 € | PU (escl VAT) : 151,40 € Remise : 0 % Total (excl VAT): 151,40 € |
| ZM0.4-100/2 the quantity has to be a multiple of 5. |
|  | HSS12-120 Shoulder screw ISO7379 Hardened Steel class 12.9 | Lead time: 03 weeks | | 39,93 € | 0 % | 39,93 € | PU (escl VAT) : 39,93 € Remise : 0 % Total (excl VAT): 39,93 € |
|  | YG1.75-73 HEAVY DUTY spur gear Steel 35NCD6 | Lead time: 08 weeks | | 203,39 € | 0 % | 203,39 € | PU (escl VAT) : 203,39 € Remise : 0 % Total (excl VAT): 203,39 € |
|  | GG1.5-36 Ground spur gear Heat treated steel | Lead time: 04 weeks | | 212,25 € | 0 % | 212,25 € | PU (escl VAT) : 212,25 € Remise : 0 % Total (excl VAT): 212,25 € |
|  | TIF10-140/SS/B Threaded stud - DIN976A Stainless steel | Lead time: 03 weeks | | 265,66 € | 0 % | 265,66 € | PU (escl VAT) : 265,66 € Remise : 0 % Total (excl VAT): 265,66 € |
| TIF10-140/SS/B, Sold in multiples (or by box) of 100. |
|  | G1-43/ECO Eco range Spur gear Steel C45 | Lead time: 03 weeks | | 6,98 € | 0 % | 6,98 € | PU (escl VAT) : 6,98 € Remise : 0 % Total (excl VAT): 6,98 € |
|  | G1-28/ECO Eco range Spur gear Steel C45 | In stock | | 4,50 € | 0 % | 4,50 € | PU (escl VAT) : 4,50 € Remise : 0 % Total (excl VAT): 4,50 € |
|  | PCS75-19H-38K Chain sprocket with hardened teeth 19.05mm (DIN12B-1) | Lead time: 03 weeks | | 31,19 € | 0 % | 31,19 € | PU (escl VAT) : 31,19 € Remise : 0 % Total (excl VAT): 31,19 € |
|  | ET4148 Extension springs DIN2097 DIN 2097 | Lead time: 03 weeks | | 13,52 € | 0 % | 13,52 € | PU (escl VAT) : 13,52 € Remise : 0 % Total (excl VAT): 13,52 € |
|  | 18T2.5-10/ECO T type timing pulley Economy range - T2.5 aluminium | Lead time: 03 weeks | | 6,30 € | 0 % | 6,30 € | PU (escl VAT) : 6,30 € Remise : 0 % Total (excl VAT): 6,30 € |
|  | EHD06-5 Internal epicyclic servo reducers from 8 to 19 Nm | Lead time: 13 weeks | | 1 096,01 € | 0 % | 1 096,01 € | PU (escl VAT) : 1 096,01 € Remise : 0 % Total (excl VAT): 1 096,01 € |
|  | M0.4-200/4 Wormwheel Bronze | Lead time: 10 weeks | | 158,11 € | 0 % | 158,11 € | PU (escl VAT) : 158,11 € Remise : 0 % Total (excl VAT): 158,11 € |
|
Total excluding delivery
|
2 189,24 €
|
| Estimated shipping costs** |
0,00 € |