| |
|
Description |
Part number |
Availability |
Qty |
PU (excl VAT) |
Discount %(excl VAT) |
Total (excl VAT) |
|
|  | RPP8/2800/20 RPP heavy duty timing belt RPP8 | Lead time: 04 weeks | | 88,84 € | 0 % | 88,84 € | PU (escl VAT) : 88,84 € Remise : 0 % Total (excl VAT): 88,84 € |
|  | QTR31316 Tapered roller bearing Steel | Lead time: 02 weeks | | 177,96 € | 0 % | 177,96 € | PU (escl VAT) : 177,96 € Remise : 0 % Total (excl VAT): 177,96 € |
|  | CLQ12-5-002 12.7mm wide steel feeler strip on rolls Feeler strip on rolls | Lead time: 02 weeks | | 48,73 € | 0 % | 48,73 € | PU (escl VAT) : 48,73 € Remise : 0 % Total (excl VAT): 48,73 € |
|  | GDR880T-82 Straight track for slat top chain Ranges 880 and 881 | Lead time: 05 weeks | | 360,44 € | 0 % | 360,44 € | PU (escl VAT) : 360,44 € Remise : 0 % Total (excl VAT): 360,44 € |
|  | HK2011A Manual locking clamp Manual locking clamp T | In stock | | 219,53 € | 0 % | 219,53 € | PU (escl VAT) : 219,53 € Remise : 0 % Total (excl VAT): 219,53 € |
|  | CHC3-20/B Socket headed screw Steel class 12.19 | In stock | | 16,32 € | 0 % | 16,32 € | PU (escl VAT) : 16,32 € Remise : 0 % Total (excl VAT): 16,32 € |
| CHC3-20/B, Sold in multiples (or by box) of 200. |
|  | GG1.5-90 Ground spur gear Heat treated steel | Lead time: 04 weeks | | 549,75 € | 0 % | 549,75 € | PU (escl VAT) : 549,75 € Remise : 0 % Total (excl VAT): 549,75 € |
|  | AT5/1500/10 AT type timing belt AT5 Steel cored polyurethane | In stock | | 60,55 € | 0 % | 60,55 € | PU (escl VAT) : 60,55 € Remise : 0 % Total (excl VAT): 60,55 € |
|  | CHC5-30/B Socket headed screw Steel class 12.19 | In stock | | 20,29 € | 0 % | 20,29 € | PU (escl VAT) : 20,29 € Remise : 0 % Total (excl VAT): 20,29 € |
| CHC5-30/B, Sold in multiples (or by box) of 200. |
|  | CHC2.5-10/B Socket headed screw Steel class 12.19 | In stock | | 52,90 € | 0 % | 52,90 € | PU (escl VAT) : 52,90 € Remise : 0 % Total (excl VAT): 52,90 € |
| CHC2.5-10/B, Sold in multiples (or by box) of 200. |
|  | ZG0.4-32 Plastic spur gear Machined plastic (delrin) | Lead time: 08 weeks | | 12,98 € | 22 % | 121,49 € | PU (escl VAT) : 121,49 € Remise : 22 % Total (excl VAT): 121,49 € |
| ZG0.4-32 the quantity has to be a multiple of 12. |
|  | RPP8/920/20 RPP heavy duty timing belt RPP8 | Lead time: 04 weeks | | 35,22 € | 0 % | 35,22 € | PU (escl VAT) : 35,22 € Remise : 0 % Total (excl VAT): 35,22 € |
|
Total excluding delivery
|
1 752,02 €
|
| Estimated shipping costs** |
0,00 € |