| |
|
Description |
Part number |
Availability |
Qty |
PU (excl VAT) |
Discount %(excl VAT) |
Total (excl VAT) |
|
|  | CLQ50-300-23/A Assorted feeler strips Assorted feeler strips | Lead time: 2 weeks | | 90,26 € | 0 % | 90,26 € | PU (escl VAT) : 90,26 € Remise : 0 % Total (excl VAT): 90,26 € |
|  | T39050 Extension spring in metre length steel by the metre | In stock | | 40,37 € | 0 % | 40,37 € | PU (escl VAT) : 40,37 € Remise : 0 % Total (excl VAT): 40,37 € |
|  | T39200 Extension spring in metre length steel by the metre | In stock | | 68,84 € | 0 % | 68,84 € | PU (escl VAT) : 68,84 € Remise : 0 % Total (excl VAT): 68,84 € |
|  | SH1.25-21/RH Parallel axis helical gear Steel 20NCD2 | Lead time: 8 weeks | | 44,13 € | 0 % | 132,39 € | PU (escl VAT) : 132,39 € Remise : 0 % Total (excl VAT): 132,39 € |
| SH1.25-21/RH the quantity has to be a multiple of 3. |
|  | P40-30 Worm and wheel gear reducer up to 18 Nm | Lead time: 8 weeks | | 693,42 € | 0 % | 693,42 € | PU (escl VAT) : 693,42 € Remise : 0 % Total (excl VAT): 693,42 € |
|  | PRES-ER25-16 Manual workbench press accessory for PRES-3HR end PRES-4HR Tool holder | Lead time: 3 weeks | | 450,30 € | 0 % | 450,30 € | PU (escl VAT) : 450,30 € Remise : 0 % Total (excl VAT): 450,30 € |
|  | Z-12-1000A Shaft for linear guides Hardened ground steel | In stock | | 22,11 € | 0 % | 22,11 € | PU (escl VAT) : 22,11 € Remise : 0 % Total (excl VAT): 22,11 € |
|  | RVM25-20 Manually operated gearbox Bevel | In stock | | 166,59 € | 0 % | 166,59 € | PU (escl VAT) : 166,59 € Remise : 0 % Total (excl VAT): 166,59 € |
|  | SH3-95/RH Parallel axis helical gear Steel 20NCD2 | Lead time: 8 weeks | | 1 122,78 € | 0 % | 1 122,78 € | PU (escl VAT) : 1 122,78 € Remise : 0 % Total (excl VAT): 1 122,78 € |
|  | R203624 Die spring ISO10243 Light | Lead time: 3 weeks | | 24,69 € | 0 % | 24,69 € | PU (escl VAT) : 24,69 € Remise : 0 % Total (excl VAT): 24,69 € |
|  | SH1.25-90/RH Parallel axis helical gear Steel 20NCD2 | Lead time: 8 weeks | | 114,30 € | 0 % | 228,60 € | PU (escl VAT) : 228,60 € Remise : 0 % Total (excl VAT): 228,60 € |
| SH1.25-90/RH the quantity has to be a multiple of 2. |
|  | H1.25-84/RH Crossed helical gear crossed axis at 90° Steel 20NCD2 | Lead time: 8 weeks | | 161,86 € | 0 % | 161,86 € | PU (escl VAT) : 161,86 € Remise : 0 % Total (excl VAT): 161,86 € |
|  | CHMR75-30 Worm and wheel gear reducer up to 298 Nm | Lead time: 3 weeks | | 422,02 € | 0 % | 422,02 € | PU (escl VAT) : 422,02 € Remise : 0 % Total (excl VAT): 422,02 € |
|  | DCA16-NBR Suction cup, 1.5 bellows nitrile | In stock | | 6,66 € | 0 % | 13,32 € | PU (escl VAT) : 13,32 € Remise : 0 % Total (excl VAT): 13,32 € |
| DCA16-NBR the quantity has to be a multiple of 2. |
|  | MET30-38-24 Cylindrical sintered bronze bush Self-lubricating sintered bronze | In stock | | 7,26 € | 0 % | 7,26 € | PU (escl VAT) : 7,26 € Remise : 0 % Total (excl VAT): 7,26 € |
|  | UGAC-20F Actuator guide kit Coupling for threaded cylinder end | Lead time: 1 weeks | | 39,79 € | 0 % | 39,79 € | PU (escl VAT) : 39,79 € Remise : 0 % Total (excl VAT): 39,79 € |
|  | SH1.25-90/LH Parallel axis helical gear Steel 20NCD2 | Lead time: 8 weeks | | 114,30 € | 0 % | 228,60 € | PU (escl VAT) : 228,60 € Remise : 0 % Total (excl VAT): 228,60 € |
| SH1.25-90/LH the quantity has to be a multiple of 2. |
|  | FBL6000-K19 Brush strip per meter horsehair fibres Ø0.2 Black horsehair | In stock | | 69,53 € | 0 % | 69,53 € | PU (escl VAT) : 69,53 € Remise : 0 % Total (excl VAT): 69,53 € |
|  | ZSH1.25-50/RH Parallel axis helical gear Machined plastic (delrin) | Lead time: 8 weeks | | 56,88 € | 0 % | 170,64 € | PU (escl VAT) : 170,64 € Remise : 0 % Total (excl VAT): 170,64 € |
| ZSH1.25-50/RH the quantity has to be a multiple of 3. |
|  | BPTR-36 End cap for round tube Standard | In stock | | 0,91 € | 0 % | 9,10 € | PU (escl VAT) : 9,10 € Remise : 0 % Total (excl VAT): 9,10 € |
| BPTR-36 the quantity has to be a multiple of 10. |
|  | LWL9-480 Linear ball slide - Stainless steel balls Rail - from 514 N to 16700 N | In stock | | 289,96 € | 0 % | 289,96 € | PU (escl VAT) : 289,96 € Remise : 0 % Total (excl VAT): 289,96 € |
|  | CHN-8/B Straight long link chain Galvanised steel | Lead time: 2 weeks | | 70,54 € | 0 % | 70,54 € | PU (escl VAT) : 70,54 € Remise : 0 % Total (excl VAT): 70,54 € |
|  | R203404 Die spring ISO10243 Light | In stock | | 4,61 € | 0 % | 4,61 € | PU (escl VAT) : 4,61 € Remise : 0 % Total (excl VAT): 4,61 € |
|  | DCA33-NBR Suction cup, 1.5 bellows nitrile | In stock | | 7,44 € | 0 % | 14,88 € | PU (escl VAT) : 14,88 € Remise : 0 % Total (excl VAT): 14,88 € |
| DCA33-NBR the quantity has to be a multiple of 2. |
|  | P45-60 Worm and wheel gear reducer up to 40 Nm | In stock | | 835,69 € | 0 % | 835,69 € | PU (escl VAT) : 835,69 € Remise : 0 % Total (excl VAT): 835,69 € |
|  | BPTR-27 End cap for round tube Standard | In stock | | 0,45 € | 0 % | 9,00 € | PU (escl VAT) : 9,00 € Remise : 0 % Total (excl VAT): 9,00 € |
| BPTR-27 the quantity has to be a multiple of 20. |
|  | R203316 Die spring ISO10243 Light | In stock | | 8,08 € | 0 % | 8,08 € | PU (escl VAT) : 8,08 € Remise : 0 % Total (excl VAT): 8,08 € |
|  | R203304 Die spring ISO10243 Light | In stock | | 4,25 € | 0 % | 4,25 € | PU (escl VAT) : 4,25 € Remise : 0 % Total (excl VAT): 4,25 € |
|  | METC40-46-25 Flanged sintered bronze bush Self-lubricating sintered bronze | In stock | | 8,69 € | 0 % | 8,69 € | PU (escl VAT) : 8,69 € Remise : 0 % Total (excl VAT): 8,69 € |
|  | EAR95-200 Bearing locknut Self locking locknut - nylon lock washer | In stock | | 70,60 € | 0 % | 70,60 € | PU (escl VAT) : 70,60 € Remise : 0 % Total (excl VAT): 70,60 € |
|  | CHB4-BR Reaction arm CHB gear reducers reaction arm | Lead time: 3 weeks | | 19,73 € | 0 % | 19,73 € | PU (escl VAT) : 19,73 € Remise : 0 % Total (excl VAT): 19,73 € |
|  | RUR100 Wheel Polyurethane - Aluminium rim (Free running) | Lead time: 2 weeks | | 23,30 € | 0 % | 23,30 € | PU (escl VAT) : 23,30 € Remise : 0 % Total (excl VAT): 23,30 € |
|  | P45-20 Worm and wheel gear reducer up to 40 Nm | In stock | | 835,69 € | 0 % | 835,69 € | PU (escl VAT) : 835,69 € Remise : 0 % Total (excl VAT): 835,69 € |
|  | GCH20-1200 Linear ball slide Eco Range economy range | In stock | | 138,85 € | 0 % | 138,85 € | PU (escl VAT) : 138,85 € Remise : 0 % Total (excl VAT): 138,85 € |
|  | PT821-25-40 Drive sprocket for slat top chain Ranges 821 and 805 | Lead time: 5 weeks | | 96,88 € | 0 % | 96,88 € | PU (escl VAT) : 96,88 € Remise : 0 % Total (excl VAT): 96,88 € |
|  | MTB3-16 Moulded plastic bevel gear (nylon) 3:1 | Lead time: 99 weeks | | 0,00 € | 0 % | 0,00 € | PU (escl VAT) : 0,00 € Remise : 0 % Total (excl VAT): 0,00 € |
|  | BHEX-6/B Hexagonal cap Black technopolymer | In stock | | 21,09 € | 0 % | 21,09 € | PU (escl VAT) : 21,09 € Remise : 0 % Total (excl VAT): 21,09 € |
| BHEX-6/B, Sold in multiples (or by box) of 100. |
|  | BTC100-40 End cap for rectangular tube Standard | In stock | | 7,62 € | 0 % | 7,62 € | PU (escl VAT) : 7,62 € Remise : 0 % Total (excl VAT): 7,62 € |
| BTC100-40 the quantity has to be a multiple of 1. |
|  | LVT2-108-3-300 Miniature motorised actuator 2A 2 ampers | Lead time: 6 weeks | | 257,17 € | 0 % | 257,17 € | PU (escl VAT) : 257,17 € Remise : 0 % Total (excl VAT): 257,17 € |
|  | RVM25-17 Manually operated gearbox Bevel | In stock | | 203,42 € | 0 % | 203,42 € | PU (escl VAT) : 203,42 € Remise : 0 % Total (excl VAT): 203,42 € |
|  | BETA-7/B Hitch pin Hitch | Lead time: 2 weeks | | 44,66 € | 0 % | 44,66 € | PU (escl VAT) : 44,66 € Remise : 0 % Total (excl VAT): 44,66 € |
| BETA-7/B, Sold in multiples (or by box) of 25. |
|  | R204608 Die spring ISO10243 Average | In stock | | 11,34 € | 0 % | 11,34 € | PU (escl VAT) : 11,34 € Remise : 0 % Total (excl VAT): 11,34 € |
|  | LWL25-240 Linear ball slide - Stainless steel balls Rail - from 514 N to 16700 N | Lead time: 4 weeks | | 211,52 € | 0 % | 211,52 € | PU (escl VAT) : 211,52 € Remise : 0 % Total (excl VAT): 211,52 € |
|  | Z-40-1000A Shaft for linear guides Hardened ground steel | In stock | | 163,74 € | 0 % | 163,74 € | PU (escl VAT) : 163,74 € Remise : 0 % Total (excl VAT): 163,74 € |
|  | VRBS-31 Folding lifting ring for welding Folding - for welding | Lead time: 2 weeks | | 750,79 € | 0 % | 750,79 € | PU (escl VAT) : 750,79 € Remise : 0 % Total (excl VAT): 750,79 € |
|  | CHB3-40-63B14 Worm and wheel gear reducer up to 22 Nm | Lead time: 3 weeks | | 146,99 € | 0 % | 146,99 € | PU (escl VAT) : 146,99 € Remise : 0 % Total (excl VAT): 146,99 € |
|  | SHN-14/B Hexagonal nut DIN934 A2 Stainless steel | In stock | | 34,42 € | 0 % | 34,42 € | PU (escl VAT) : 34,42 € Remise : 0 % Total (excl VAT): 34,42 € |
| SHN-14/B, Sold in multiples (or by box) of 100. |
|  | BTC40-15 End cap for rectangular tube Standard | Lead time: 2 weeks | | 0,64 € | 0 % | 6,40 € | PU (escl VAT) : 6,40 € Remise : 0 % Total (excl VAT): 6,40 € |
| BTC40-15 the quantity has to be a multiple of 10. |
|  | BTE6-M16 Universal tension arm For normal applications | Lead time: 3 weeks | | 148,48 € | 0 % | 148,48 € | PU (escl VAT) : 148,48 € Remise : 0 % Total (excl VAT): 148,48 € |
|  | D-ZY10-50-20 Cylindrical stop Steel | In stock | | 6,60 € | 0 % | 13,20 € | PU (escl VAT) : 13,20 € Remise : 0 % Total (excl VAT): 13,20 € |
| D-ZY10-50-20 the quantity has to be a multiple of 2. |
|  | T39000 Extension spring in metre length steel by the metre | In stock | | 35,67 € | 0 % | 35,67 € | PU (escl VAT) : 35,67 € Remise : 0 % Total (excl VAT): 35,67 € |
|  | PRES-ER25-10 Manual workbench press accessory for PRES-3HR end PRES-4HR Tool holder | Lead time: 3 weeks | | 450,30 € | 0 % | 450,30 € | PU (escl VAT) : 450,30 € Remise : 0 % Total (excl VAT): 450,30 € |
|  | Z-6-1000A Shaft for linear guides Hardened ground steel | In stock | | 31,63 € | 0 % | 31,63 € | PU (escl VAT) : 31,63 € Remise : 0 % Total (excl VAT): 31,63 € |
|  | SH1.25-40/RH Parallel axis helical gear Steel 20NCD2 | Lead time: 8 weeks | | 62,26 € | 0 % | 186,78 € | PU (escl VAT) : 186,78 € Remise : 0 % Total (excl VAT): 186,78 € |
| SH1.25-40/RH the quantity has to be a multiple of 3. |
|  | LWH45-840 High rigidity linear slide Rail - from 9320 N to 71300 N | Lead time: 4 weeks | | 582,30 € | 0 % | 582,30 € | PU (escl VAT) : 582,30 € Remise : 0 % Total (excl VAT): 582,30 € |
|  | ZH1.25-40/RH Crossed helical gear crossed axis at 90° Machined plastic (delrin) | Lead time: 8 weeks | | 61,63 € | 0 % | 184,89 € | PU (escl VAT) : 184,89 € Remise : 0 % Total (excl VAT): 184,89 € |
| ZH1.25-40/RH the quantity has to be a multiple of 3. |
|  | FAD50-6-30 Threaded swivel feet Swidel feet without anti-slip plate | In stock | | 6,70 € | 0 % | 6,70 € | PU (escl VAT) : 6,70 € Remise : 0 % Total (excl VAT): 6,70 € |
|  | BTC120-30 End cap for rectangular tube Standard | Lead time: 2 weeks | | 8,23 € | 0 % | 8,23 € | PU (escl VAT) : 8,23 € Remise : 0 % Total (excl VAT): 8,23 € |
| BTC120-30 the quantity has to be a multiple of 1. |
|  | RUR150 Wheel Polyurethane - Aluminium rim (Free running) | Lead time: 2 weeks | | 37,75 € | 0 % | 37,75 € | PU (escl VAT) : 37,75 € Remise : 0 % Total (excl VAT): 37,75 € |
|  | P30-120 Worm and wheel gear reducer up to 8.80 Nm | Lead time: 8 weeks | | 511,59 € | 0 % | 511,59 € | PU (escl VAT) : 511,59 € Remise : 0 % Total (excl VAT): 511,59 € |
|  | GCH25-1020 Linear ball slide Eco Range economy range | Lead time: 4 weeks | | 126,53 € | 0 % | 126,53 € | PU (escl VAT) : 126,53 € Remise : 0 % Total (excl VAT): 126,53 € |
|  | BPTR-15 End cap for round tube Standard | In stock | | 0,34 € | 0 % | 6,80 € | PU (escl VAT) : 6,80 € Remise : 0 % Total (excl VAT): 6,80 € |
| BPTR-15 the quantity has to be a multiple of 20. |
|  | R203840 Die spring ISO10243 Light | Lead time: 3 weeks | | 78,20 € | 0 % | 78,20 € | PU (escl VAT) : 78,20 € Remise : 0 % Total (excl VAT): 78,20 € |
|  | PR820-25-25 Idler sprocket for slat top chain Rangs 820 and 815 | Lead time: 5 weeks | | 41,96 € | 0 % | 41,96 € | PU (escl VAT) : 41,96 € Remise : 0 % Total (excl VAT): 41,96 € |
|  | PTR-12B1 Idler chain sprocket For standard applications | In stock | | 28,84 € | 0 % | 28,84 € | PU (escl VAT) : 28,84 € Remise : 0 % Total (excl VAT): 28,84 € |
|  | SH1.25-37/RH Parallel axis helical gear Steel 20NCD2 | Lead time: 8 weeks | | 60,30 € | 0 % | 180,90 € | PU (escl VAT) : 180,90 € Remise : 0 % Total (excl VAT): 180,90 € |
| SH1.25-37/RH the quantity has to be a multiple of 3. |
|  | BSPM1002R-300 Miniature ballscrew Nut+rolled ballscrew | Lead time: 6 weeks | | 592,96 € | 0 % | 592,96 € | PU (escl VAT) : 592,96 € Remise : 0 % Total (excl VAT): 592,96 € |
|  | T39060 Extension spring in metre length steel by the metre | Lead time: 3 weeks | | 40,82 € | 0 % | 40,82 € | PU (escl VAT) : 40,82 € Remise : 0 % Total (excl VAT): 40,82 € |
|  | CHB3-20-63B14 Worm and wheel gear reducer up to 22 Nm | Lead time: 3 weeks | | 146,99 € | 0 % | 146,99 € | PU (escl VAT) : 146,99 € Remise : 0 % Total (excl VAT): 146,99 € |
|  | SHW-8/B Plain washer A2 Stainless steel | In stock | | 17,30 € | 0 % | 17,30 € | PU (escl VAT) : 17,30 € Remise : 0 % Total (excl VAT): 17,30 € |
| SHW-8/B, Sold in multiples (or by box) of 500. |
|  | CHC3-30/B Socket headed screw Steel class 12.19 | In stock | | 37,87 € | 0 % | 37,87 € | PU (escl VAT) : 37,87 € Remise : 0 % Total (excl VAT): 37,87 € |
| CHC3-30/B, Sold in multiples (or by box) of 200. |
|
Total excluding delivery
|
11 949,07 €
|
| Estimated shipping costs** |
0,00 € |