| |
|
Description |
Part number |
Availability |
Qty |
PU (excl VAT) |
Discount %(excl VAT) |
Total (excl VAT) |
|
|  | GSI-22-250-400 Stainless steel gas spring Stainless steel | Lead time: 03 weeks | | 403,90 € | 0 % | 403,90 € | PU (escl VAT) : 403,90 € Remise : 0 % Total (excl VAT): 403,90 € |
|  | RPP8/920/50 RPP heavy duty timing belt RPP8 | Lead time: 04 weeks | | 90,87 € | 0 % | 90,87 € | PU (escl VAT) : 90,87 € Remise : 0 % Total (excl VAT): 90,87 € |
|  | LVT4-48-10-250 Miniature motorised actuator 4A 4 ampers | Lead time: 06 weeks | | 259,74 € | 0 % | 259,74 € | PU (escl VAT) : 259,74 € Remise : 0 % Total (excl VAT): 259,74 € |
|  | PNA40-214R-45/45 PERIFLEX® elastic coupling Complete coupling | Lead time: 04 weeks | | 2 074,13 € | 0 % | 2 074,13 € | PU (escl VAT) : 2 074,13 € Remise : 0 % Total (excl VAT): 2 074,13 € |
|  | PNA40-214R-65/65 PERIFLEX® elastic coupling Complete coupling | Lead time: 04 weeks | | 2 074,13 € | 0 % | 2 074,13 € | PU (escl VAT) : 2 074,13 € Remise : 0 % Total (excl VAT): 2 074,13 € |
|  | BH0202-94-6005 Single housed bearing assembly Bearing secured with circlips | Lead time: 08 weeks | | 253,56 € | 0 % | 253,56 € | PU (escl VAT) : 253,56 € Remise : 0 % Total (excl VAT): 253,56 € |
|  | GSI-15-100-400A Stainless steel adjustable gas spring Stainless steel | Lead time: 03 weeks | | 277,53 € | 0 % | 277,53 € | PU (escl VAT) : 277,53 € Remise : 0 % Total (excl VAT): 277,53 € |
|  | RFK38C-150-63B5/SS Hypoid gearbox - Stainless steel up to 200 Nm | Lead time: 09 weeks | | 1 443,96 € | 0 % | 1 443,96 € | PU (escl VAT) : 1 443,96 € Remise : 0 % Total (excl VAT): 1 443,96 € |
|  | ZH0.5-46/RH Crossed helical gear crossed axis at 90° Machined plastic (delrin) | Lead time: 08 weeks | | 24,42 € | 22 % | 114,29 € | PU (escl VAT) : 114,29 € Remise : 22 % Total (excl VAT): 114,29 € |
| ZH0.5-46/RH the quantity has to be a multiple of 6. |
|  | GAL20-60-40/RUB 60mm rubber wheel for conveyor belt Rubber | In stock | | 5,98 € | 0 % | 11,96 € | PU (escl VAT) : 11,96 € Remise : 0 % Total (excl VAT): 11,96 € |
| GAL20-60-40/RUB the quantity has to be a multiple of 2. |
|  | PNA63-218R-70/70 PERIFLEX® elastic coupling Complete coupling | Lead time: 04 weeks | | 2 363,21 € | 0 % | 2 363,21 € | PU (escl VAT) : 2 363,21 € Remise : 0 % Total (excl VAT): 2 363,21 € |
|
Total excluding delivery
|
9 367,28 €
|
| Estimated shipping costs** |
0,00 € |