| |
|
Description |
Part number |
Availability |
Qty |
PU (excl VAT) |
Discount %(excl VAT) |
Total (excl VAT) |
|
|  | DOMI120-25-CV/Z Domino 120 adjustable slide Slide DOMILINE 120 with counter and handwheel | Lead time: 03 weeks | | 1 227,17 € | 0 % | 1 227,17 € | PU (escl VAT) : 1 227,17 € Remise : 0 % Total (excl VAT): 1 227,17 € |
|  | TIF30-1000/SS Threaded rod - DIN975 Stainless steel A2 | Lead time: 03 weeks | | 112,64 € | 0 % | 112,64 € | PU (escl VAT) : 112,64 € Remise : 0 % Total (excl VAT): 112,64 € |
|  | ZW4-3 Worm Machined plastic (delrin) | Lead time: 10 weeks | | 215,40 € | 0 % | 215,40 € | PU (escl VAT) : 215,40 € Remise : 0 % Total (excl VAT): 215,40 € |
|  | R206404 Die spring ISO10243 Extra-heavy | In stock | | 5,24 € | 0 % | 5,24 € | PU (escl VAT) : 5,24 € Remise : 0 % Total (excl VAT): 5,24 € |
|  | BFM204/LH Flanged bronze nut Bronze - 1 thread | In stock | | 80,78 € | 0 % | 80,78 € | PU (escl VAT) : 80,78 € Remise : 0 % Total (excl VAT): 80,78 € |
|  | CLQ12-5-004/SS 12.7mm wide steel feeler strip on rolls Feeler strip on rolls | Lead time: 02 weeks | | 18,89 € | 0 % | 18,89 € | PU (escl VAT) : 18,89 € Remise : 0 % Total (excl VAT): 18,89 € |
|  | G3-58 Steel spur gear Steel 20NCD2 | Lead time: 08 weeks | | 346,80 € | 0 % | 346,80 € | PU (escl VAT) : 346,80 € Remise : 0 % Total (excl VAT): 346,80 € |
|  | CDP4.1-8-16 Flanged drill bushing Steel | In stock | | 9,83 € | 0 % | 9,83 € | PU (escl VAT) : 9,83 € Remise : 0 % Total (excl VAT): 9,83 € |
|  | CDP8-12-20 Flanged drill bushing Steel | Lead time: 02 weeks | | 11,20 € | 0 % | 11,20 € | PU (escl VAT) : 11,20 € Remise : 0 % Total (excl VAT): 11,20 € |
|  | G3-39 Steel spur gear Steel 20NCD2 | Lead time: 08 weeks | | 166,71 € | 0 % | 166,71 € | PU (escl VAT) : 166,71 € Remise : 0 % Total (excl VAT): 166,71 € |
|  | MCL10-25/B Cylindrical threaded sleeve Cylindrical - steel | Lead time: 03 weeks | | 8,16 € | 0 % | 8,16 € | PU (escl VAT) : 8,16 € Remise : 0 % Total (excl VAT): 8,16 € |
| MCL10-25/B, Sold in multiples (or by box) of 20. |
|  | M1-24/4 Wormwheel Bronze | Lead time: 10 weeks | | 58,18 € | 0 % | 174,54 € | PU (escl VAT) : 174,54 € Remise : 0 % Total (excl VAT): 174,54 € |
| M1-24/4 the quantity has to be a multiple of 3. |
|  | Q6300 Deep groove ball bearing Steel | Lead time: 02 weeks | | 9,91 € | 0 % | 9,91 € | PU (escl VAT) : 9,91 € Remise : 0 % Total (excl VAT): 9,91 € |
|
Total excluding delivery
|
2 387,27 €
|
| Estimated shipping costs** |
0,00 € |